Turnkey projects

Be carried away by the experience of a leader

The decisions made in any industrial facility can have a major impact at both the economic and human level. In the short, medium and long term. Thanks to the expertise we have acquired in the more than 100 projects we carry out every year, at Gassó we have a 360º view of the technical constraints and the necessary resources to be taken into account in any fluid handling project.

Implementation process

Phase 1

Initial consultation

In this phase, we receive and evaluate your request to understand your specific needs. Our team of experts is ready to advise and guide you in defining your project.

Phase 2

Analysis and Evaluation

We carry out an exhaustive analysis of the project requirements, considering all the technical and operational specifications to guarantee an optimal solution.

Phase 3

Customised design

We design a customised solution, using the latest design tools and technologies to create a prototype that meets your expectations and needs.

Phase 4

Detailed Proposal

We present you with a detailed proposal that includes all aspects of the project, from costs to delivery times and technical specifications.

Phase 5

Confirmation and Order

Once the proposal has been approved, we formalise the order and proceed to the detailed planning of the project, ensuring that all the elements are in place for efficient production.

Phase 6

Validation of Plans

We prepare and send the detailed plans for review and approval. This step guarantees that everything is in accordance with their specifications before starting production.

Phase 7

Production and Assembly

With the plans approved, we begin the production phase in our facilities, using high-quality materials and advanced manufacturing processes to guarantee a final product of excellence.

Phase 8

Delivery and Start-up

We coordinate the delivery of the finished product and, if necessary, assist in its installation and commissioning, ensuring that everything works perfectly from day one. Also providing an after-sales service for the maintenance and repair of the project.

Success stories

Gassó Pneumatic Non-drip Breather Hose

International Chemical Company requests support to perform safe loading with top loading arms with highly hazardous products such as sulfuric acid.

When the top loading is done, once the product valve is closed, there is still product remaining in the arm, and therefore product dripping.

The customer is presented with an addition to their current loading arm. It is a drip tube made of a chemically resistant material that completely closes the outlet of the dip tube, preventing any subsequent leakage or dripping. This is a pneumatic operation and is controlled by a remote control so that the operator can stand at a safe distance.
The client values our proposal positively, awarding us the order, the commissioning and the annual maintenance service.

Chemical Sector

Can we help you?

Contact us,
we will advise you with no obligation

*Mandatory fields.
By clicking Send, you agree that you have read our Privacy Policy and that Gassó may store and process the personal information provided to send the requested information.

Latest posts

In the pharmaceutical, cosmetics and fine chemicals industries, choosing the right materials is essential to guaranteeing the quality, safety and efficiency of processes.
The answer is clear: for safety and efficiency. The proper control and management of fluids in industry is fundamental to the development of any operation.
Josep Gasso i Martí was the first importer of rubber in Spain, he was also a founding member and first president of the Barcelona Chamber of Commerce for 5 years, and founder and president for 11 years of the Barcelona Chamber of Urban Property.