The decisions made in any industrial facility can have a major impact at both the economic and human level. In the short, medium and long term. Thanks to the expertise we have acquired in the more than 100 projects we carry out every year, at Gassó we have a 360º view of the technical constraints and the necessary resources to be taken into account in any fluid handling project.
In this phase, we receive and evaluate your request to understand your specific needs. Our team of experts is ready to advise and guide you in defining your project.
We carry out an exhaustive analysis of the project requirements, considering all the technical and operational specifications to guarantee an optimal solution.
We design a customised solution, using the latest design tools and technologies to create a prototype that meets your expectations and needs.
We present you with a detailed proposal that includes all aspects of the project, from costs to delivery times and technical specifications.
Once the proposal has been approved, we formalise the order and proceed to the detailed planning of the project, ensuring that all the elements are in place for efficient production.
We prepare and send the detailed plans for review and approval. This step guarantees that everything is in accordance with their specifications before starting production.
With the plans approved, we begin the production phase in our facilities, using high-quality materials and advanced manufacturing processes to guarantee a final product of excellence.
We coordinate the delivery of the finished product and, if necessary, assist in its installation and commissioning, ensuring that everything works perfectly from day one. Also providing an after-sales service for the maintenance and repair of the project.
International Chemical Company requests support to perform safe loading with top loading arms with highly hazardous products such as sulfuric acid.
When the top loading is done, once the product valve is closed, there is still product remaining in the arm, and therefore product dripping.
The customer is presented with an addition to their current loading arm. It is a drip tube made of a chemically resistant material that completely closes the outlet of the dip tube, preventing any subsequent leakage or dripping. This is a pneumatic operation and is controlled by a remote control so that the operator can stand at a safe distance.
The client values our proposal positively, awarding us the order, the commissioning and the annual maintenance service.
Chemical Sector
Contact us,
we will advise you with no obligation
Gassó Equipments S.A.
C/ Múrcia, 35
Polígono Industrial Can Calderón
08830 Sant Boi de Llobregat
Barcelona
+34 936 529 800
gasso@gasso.com